Eastern mountain avens (Geum peckii): proposed action plan

Species at Risk Act
Recovery Strategy Series

Eastern Mountain Avens

Eastern Mountain Avens
Photo: © Eastern Mountain Avens on Brier Island, Nova Scotia by June Swift.

Table of Contents

List of Figures

List of Tables

List of Appendices

Document Information

Action Plan for the Eastern Mountain Avens (Geum peckii) in Canada - 2016 [Proposed]

Recovery Strategy for the Wood Bison
Photo: © June Swift.

2016

Recommended citation:

Environment and Climate Change Canada. 2016. Action Plan for the Eastern Mountain Avens (Geum peckii) in Canada [Proposed]. Species at Risk Act Action Plan Series. Environment and Climate Change Canada, Ottawa. v + 23 pp.

For copies of the action plan, or for additional information on species at risk, including the Committee on the Status of Endangered Wildlife in Canada (COSEWIC) Status Reports, residence descriptions, recovery strategies, and other related recovery documents, please visit the Species at Risk (SAR) Public Registry.

Cover illustration: graciously provided by Wes Olson.

Également disponible en français sous le titre
« Plan d'action pour la benoîte de Peck (Geum peckii) au Canada [Proposition] »

Content (excluding the illustrations) may be used without permission, with appropriate credit to the source.

Preface

The federal, provincial, and territorial government signatories under the Accord for the Protection of Species at Risk (1996) agreed to establish complementary legislation and programs that provide for effective protection of species at risk throughout Canada. Under the Species at Risk Act (S.C. 2002, c.29) (SARA), the federal competent ministers are responsible for the preparation of action plans for species listed as Extirpated, Endangered, and Threatened for which recovery has been deemed feasible. They are also required to report on progress within five years after the publication of the final document on the SAR Public Registry.

Under SARA, one or more action plan(s) provides the detailed recovery planning that supports the strategic direction set out in the recovery strategy for the species. The plan outlines what needs to be done to achieve the population and distribution objectives (previously referred to as recovery goals and objectives) identified in the recovery strategy, including the measures to be taken to address the threats and monitor the recovery of the species, as well as the proposed measures to protect critical habitat that has been identified for the species. The action plan also includes an evaluation of the socio-economic costs of the action plan and the benefits to be derived from its implementation. The action plan is considered one in a series of documents that are linked and should be taken into consideration together. Those being the COSEWIC status report, the recovery strategy, and one or more action plans.

The Minister of Environment and Climate Change is the competent minister under SARA for the Eastern Mountain Avens and has prepared this action plan to implement the recovery strategy, as per section 47 of SARA. To the extent possible, it has been prepared in cooperation with the Province of Nova Scotia, the Eastern Mountain Avens Recovery Team, environmental non-government organizations, industry stakeholders, Aboriginal groups, and private landowners.

Success in the recovery of this species depends on the commitment and cooperation of many different constituencies that will be involved in implementing the directions and actions set out in this action plan and will not be achieved by Environment and Climate Change Canada, or any other jurisdiction alone. All Canadians are invited to join in supporting and implementing this action plan for the benefit of the Eastern Mountain Avens and Canadian society as a whole.

Implementation of this action plan is subject to appropriations, priorities, and budgetary constraints of the participating jurisdictions and organizations.

The recovery strategy sets the strategic direction to arrest or reverse the decline of the species, including identification of critical habitat to the extent possible. It provides all Canadians with information to help take action on species conservation. When the recovery strategy identifies critical habitat, there may be future regulatory implications, depending on where the critical habitat is identified. SARA requires that critical habitat identified within a national park named and described in Schedule 1 to the Canada National Parks Act, the Rouge National Urban Park established by the Rouge National Urban Park Act, a marine protected area under the Oceans Act, a migratory bird sanctuary under the Migratory Birds Convention Act, 1994 or a national wildlife area under the Canada Wildlife Act be described in the Canada Gazette, after which prohibitions against its destruction will apply. For critical habitat located on other federal lands, the competent minister must either make a statement on existing legal protection or make an order so that the prohibition against destruction of critical habitat applies. For any part of critical habitat located on non-federal lands, if the competent minister forms the opinion that any portion of critical habitat is not protected by provisions in or measures under SARA or other Acts of Parliament, or the laws of the province or territory, SARA requires that the Minister recommend that the Governor in Council make an order to prohibit destruction of critical habitat. The discretion to protect critical habitat on non-federal lands that is not otherwise protected rests with the Governor in Council.

Acknowledgements

This action plan was prepared by Samara Eaton (Environment and Climate Change Canada, Canadian Wildlife Service, Atlantic Region) in collaboration with Sherman Boates and Mark Elderkin (Nova Scotia Department of Natural Resources), Nick Hill (Fern Hill Institute for Plant Conservation), and the Eastern Mountain Avens Recovery Team. Their efforts and contribution are gratefully acknowledged. Many organizations and individuals have played an important role in recovery actions already completed or underway for Eastern Mountain Avens and their efforts are recognized and appreciated.

Executive Summary

This action plan complements the Recovery Strategy for the Eastern Mountain Avens (Geum peckii) in Canada (Environment Canada 2010) and will be implemented in Nova Scotia, where the species is only known to occur in Canada. This plan addresses all three objectives set out in the recovery strategy for the entire population and distribution of the Eastern Mountain Avens.

Critical habitat for Eastern Mountain Avens was identified in the recovery strategy and as a result of ongoing conservation and recovery efforts, additional information now exists regarding the species and its habitat and thus critical habitat is updated in this action. Critical habitat is all located on non-federal lands, on Brier Island and Digby Neck (Nova Scotia), and is fully identified at this time. Proposed measures to protect critical habitat are presented in section 1.4.

The recovery measures included in this plan are required to implement the recommended recovery approaches outlined in the recovery strategy. Recovery measures in this plan are organized according to broad strategies and the implementation schedule in section 1.2 identifies which threats the measure addresses, indicates the level of priority, and delineates timelines. The recovery measures proposed for the Eastern Mountain Avens are related to five broad strategies:

  1. research;
  2. monitoring;
  3. management;
  4. education and outreach;
  5. stewardship.

The socio-economic evaluation was completed and it was determined that the direct and indirect costs associated with the implementation of this action plan are considered low. Implementation of this action plan will benefit not only Eastern Mountain Avens, but also other species, wetlands, and biodiversity.

1. Recovery Actions

1.1 Context and Scope of the Action Plan

The Eastern Mountain Avens (Geum peckii) is a rhizomatous perennial herb that produces sunny yellow flowers in the summer. It grows in moist to wet, sparsely treed coastal peatlands where competition is low. In Canada, it is found only in southwestern Nova Scotia at sites on Brier Island and one site on the southern tip of Digby Neck. The only other location for this species in the world is the White Mountains of New Hampshire in the United States where it grows in alpine habitat.

Eastern Mountain Avens was assessed as Endangered by the Committee on the Status of Endangered Wildlife in Canada (COSEWIC) in 1986 and that status was confirmed during the reassessment in 1999, 2000 and 2010. The species was listed as Endangered under the Nova Scotia Endangered Species Act in 2000 and federal Species at Risk Act (SARA) in 2003.

Eastern Mountain Avens is a highly disjunct species with a very limited distribution and substantial population declines in Canada. Threats to the species include: habitat alteration; changes in hydrology through road maintenance and development; drainage ditches; and off higway vehicle use. Historical loss of habitat at one location was caused by the creation of a drainage ditch through a wetland , which in turn led to succession of the wetland and nutrient enrichment by nesting gulls.

The recovery measures outlined in this action plan are required to implement the strategies and recommended approaches found in the Recovery Strategy for the Eastern Mountain Avens (Geum peckii) in Canada (Environment Canada 2010). As a result of ongoing conservation and recovery efforts, additional information now exists regarding the species and its habitat and thus critical habitat is updated in this action plan.

The goal of the recovery strategy is to protect and maintain extant populations at current levels of abundance or greater with no reduction in the current range. The recovery objectives are to:

  1. Maintain populations at occupied sites
  2. Improve conditions and enhance populations at occupied sites
  3. Improve conditions at previously occupied sites

This action plan covers the entire population and distribution of the Eastern Mountain Avens in Canada and recovery measures in this action plan address all three objectives from the recovery strategy.

This action plan should be considered along with the Recovery Strategy for the Eastern Mountain Avens (Geum peckii) in Canada (Environment Canada 2010). The recovery strategy provides more details on the strategic direction and approaches for recovery of Eastern Mountain Avens, critical habitat information, and background information on the species and its threats.

1.2 Measures to be Taken and Implementation Schedule

The recovery measures outlined in the implementation schedule (Table 1) are arranged according to the broad strategies identified in the recovery strategy. The implementation schedule includes the level of priority (high, medium, low) assigned to each measure, the threats addressed, and the timeline. Since the posting of the recovery strategy, conservation and recovery efforts have resulted in significant new information which is incorporated into this action plan.

Within Nova Scotia, Eastern Mountain Avens is found in two geographic locations: Brier Island and on Digby Neck (peninsula on the mainland 15 km east of Brier Island). Over 95% of all Eastern Mountain Avens individuals are at the sites on Brier Island. There are two different habitats within which Eastern Mountain Avens is found: fen habitat and old field habitat (described in critical habitat section). On Brier Island, there are multiple Eastern Mountain Avens sites; the majority of plants (90%) occur in fen habitats, the remainder (10%) occurs in old field habitat. At Digby Neck, Eastern Mountain Avens occurs at one site only, in fen habitat.

Recovery approaches and measures for Eastern Mountain Avens will be implemented in a phased approach, with the initial two phases focusing on the restoration of Big Meadow Bog on Brier Island. These two initial phases are the highest priority and are on an immediate timeline. These first phases move recovery through knowledge gathering, planning, monitoring and risk assessment to on the ground restoration. The third phase addresses the long term maintenance of Eastern Mountain Avens sites that occur around Big Meadow Bog as well as in the other habitat categories.

Eastern Mountain Avens sites are grouped according to the following four habitat categories in order to facilitate planning, prioritization, and delivery of recovery action on the ground. The following is a description of each of these categories and linkages to the relevant phases of recovery that pertain to each.

Table 1. Implementation schedule for all recovery measures.

Broad Strategy: Research - Approach: Conduct biological and ecological research related to the restoration of Big Meadow Bog (Phase 1)
# Recovery measures Priority Table Footnotea Threats or objectives addressed Timeline
1 Further the understanding of surface and ground water hydrology to inform restoration planning with emphasis on landscape linkages (swamp to fen) that determine lagg hydrology High Drainage ditch, Gull nesting 2016-2017
2 Construct predictive models for Eastern Mountain Avens using environmental variables to guide habitat restoration High Drainage ditch, Gull nesting 2016-2017
3 Conduct experimental transplantations of Eastern Mountain Avens over naturally occurring moisture gradients High Drainage ditch, Gull nesting 2016-2017
4 Complete baseline sampling to provide performance benchmarks regarding vegetation, Eastern Mountain Avens metrics, nutrients, contaminants, hydrology, water quality, and gulls High Drainage ditch, Gull nesting 2016-2017
Broad Strategy: Research - Approach: Continue experimental approach for active vegetation management at old field sites (Phase 3)
# Recovery measures Priority Table Footnotea Threats or objectives addressed Timeline
5 For old field sites, continue active vegetation management experimental approach for the rescue of populations facing eradication through competitive exclusion, and determine whether to implement active vegetation management at a larger scale on an ongoing basis Low Encroachment 2016-2018

*Unless otherwise noted in the text, the recovery measure applies to all Eastern Mountain Avens sites.

Broad Strategy: Research - Approach: Conduct biological and ecological research related to contingency planning for the species at all sites (Phase 3)
# Recovery measures Priority Table Footnotea Threats or objectives addressed Timeline
6 Explore methods of population enhancement and determine feasibility for seed banking and transplanting within the Nova Scotia population Low All 2016-2021
7 Conduct genetic analyses to identify natural patterns and key areas of genetic importance for the long-term safety of the Canadian Eastern Mountain Avens population, and the possibility/feasibility for human-assisted rescue of Eastern Mountain Avens populations Medium All 2019
8 Evaluate the potential risks associated with alien and native invasive species apart from their known indicator value as reflecting habitat disturbance and enrichment (e.g. Big Meadow ditching and enrichment by gulls) Low All 2021
9 Further the understanding of the historic role of fire in Eastern Mountain Avens habitats (e.g. Big Meadow Bog and and coastal fen) and its potential application as a management tool to maintain population genetic variability Low All 2021

*Unless otherwise noted in the text, the recovery measure applies to all Eastern Mountain Avens sites.

Broad Strategy: Research - Approach: Conduct research related to increasing the understanding of the biology and ecology of Eastern Mountain Avens (Phase 1)
# Recovery measures Priority Table Footnotea Threats or objectives addressed Timeline
10 Continue to further understanding life history, population dynamics, reproduction and genetics and implications for population genetic structure Medium All Ongoing
11 Assess risk of local extinction at all sites on Brier Island other than Big Meadow Bog, through monitoring and analysis to inform the priority of recovery measures High All 2016-2020
12 Assess the risk of local extinction at Digby Neck (Harris Lake) marginal fen site and water table implications of 1950 damming High All 2018-2019
13 Apply the Eastern Mountain Avens predictive model from Brier Island to unoccupied fen land between Brier Island and Tiddville (Digby Neck) to determine the suitability of unoccupied fen land and its significance with respect to the longer term recovery of Eastern Mountain Avens Low All 2021
14 Planning for and mitigating impacts of climate change on Eastern Mountain Avens Low All 2021

*Unless otherwise noted in the text, the recovery measure applies to all Eastern Mountain Avens sites.

Broad Strategy: Research - Approach: Increase collaboration and coordination of research
# Recovery measures Priority Table Footnotea Threats or objectives addressed Timeline
15 Meet, collaborate, and coordinate research efforts with other species at risk Recovery Teams and other academic researchers and cooperate with conservation efforts on Eastern Mountain Avens in New Hampshire Low All Ongoing

*Unless otherwise noted in the text, the recovery measure applies to all Eastern Mountain Avens sites.

Broad Strategy: Monitoring - Approach: Develop and implement a monitoring program related to the restoration of Big Meadow Bog (Phase 2 and 3)
# Recovery measures Priority Table Footnotea Threats or objectives addressed Timeline
16 Once bog restoration has been initiated, implement restoration monitoring plan, including monitoring of species, vegetation community, hydrology, nutrients, and gulls High Drainage ditch, Gull nesting Ongoing
17 Coordinate monitoring efforts with volunteers, non-government organizations, academia, and government and engage multiple stakeholders in the implementation Medium Drainage ditch, Gull nesting Ongoing

*Unless otherwise noted in the text, the recovery measure applies to all Eastern Mountain Avens sites.

Broad Strategy: Monitoring - Approach: Implement a long-term monitoring program for Eastern Mountain Avens and its habitat at all sites (Phase 1)
# Recovery measures Priority Table Footnotea Threats or objectives addressed Timeline
18 Implement protocols and methods of counting for surveying populations and, for all sites, to determine population abundance and distribution and enable determination of population trends High All Completed
19 Implement systematic habitat and threat monitoring (permanent plots) for all sites other than Big Meadow Bog (Brier Island) particularly OHV use, encroaching vegetation, as well as lakeshore alteration and dam management for Digby Neck High All Ongoing
20 Ensure databases containing all population data, as well as habitat and threat monitoring data are up to date, well documented, and readily accessible High All Ongoing

*Unless otherwise noted in the text, the recovery measure applies to all Eastern Mountain Avens sites.

Broad Strategy: Management - Approach: Conduct restoration of the marginal fen at Big Meadow Bog (Phase 2)
# Recovery measures Priority Table Footnotea Threats or objectives addressed Timeline
21 Finalize restoration plan, including engineering design, for increasing water levels in order to recover ombrotrophy, restore the bog margin (lagg) hydrology, restore open fenland for Eastern Mountain Avens and increase Eastern Mountain Avens populations and spatial distribution High Drainage ditch, Gull nesting 2015-2016
22 Implement the engineering design to increase water levels and begin restoration High Drainage ditch, Gull nesting 2015-2018
23 Adaptively manage the restoration, based on results of monitoring and the return of the bog to ombrotrophic conditions and the recovery of Eastern Mountain Avens High Drainage ditch, Gull nesting 2016-2021

*Unless otherwise noted in the text, the recovery measure applies to all Eastern Mountain Avens sites.

Broad Strategy: Management - Approach: Implement active vegetation management actions in old field sites (Phase 3)
# Recovery measures Priority Table Footnotea Threats or objectives addressed Timeline
24 For old field sites, if results of research actions regarding active vegetation management result in a positive impact on Eastern Mountain Avens, implement at old field sites Low Encroachment 2019

*Unless otherwise noted in the text, the recovery measure applies to all Eastern Mountain Avens sites.

Broad Strategy: Management - Approach: Employ a variety of approaches to reduce threats and protect habitat at all sites
# Recovery measures Priority Table Footnotea Threats or objectives addressed Timeline
25 Use securement approaches on private land including: conservation easements, purchase, or donations Medium All Ongoing
26 Use education and stewardship initiatives with all of audiencesto protect habitat Medium All Ongoing
27 Support and encourage enforcement of all existing laws and regulations that pertain to the threats, including appropriate species at risk training and seek amendments and/or increased resource for enforcement, where appropriate High All 2016-2019
28 Ensure data and critical habitat locations for all Eastern Mountain Avens sites are available for regulators, such as provincial departments and municipalities High All 2016-2017
29 Reduce OHV traffic through Eastern Mountain Avens habitat by working with riders to establish acceptable re-routing of trails and discouraging off-trail riding Low OHV use Ongoing

*Unless otherwise noted in the text, the recovery measure applies to all Eastern Mountain Avens sites.

Broad Strategy: Education and Outreach - Approach: Continue to develop and strengthen education and outreach initiatives regarding Eastern Mountain Avens conservation and recovery
# Recovery measures Priority Table Footnotea Threats or objectives addressed Timeline
30 Develop a plan regarding outreach and communication for restoration related recovery measures including interpretation, access, programs and communication High Drainage ditch, Gull nesting 2016-2021
31 Continue to work with the Brier Island community and encourage a community led, post restoration, development of interpretation enterprises and promotion of ecotourism components High Drainage ditch, Gull nesting Ongoing
32 For all non-Big Meadow sites, develop strategic education initiatives that specifically target landowners with Eastern Mountain Avens and critical habitat or members of the public who access known sites Medium All Ongoing
33 Overall, developbroader education initiatives for Eastern Mountain Avens conservation that target the whole community, with particular focus on engaging youth Medium All Ongoing

*Unless otherwise noted in the text, the recovery measure applies to all Eastern Mountain Avens sites.

Broad Strategy: Stewardship - Approach: Continue to foster cooperative relationships for Eastern Mountain Avens conservation and recovery with landowners, community, OHV riders, volunteers, industry, and ecotourists
# Recovery measures Priority Table Footnotea Threats or objectives addressed Timeline
34 Continue and improve stewardship initiatives with landowners and continue to build relationships with landowners already contacted and not yet approached High All Ongoing
35 Where possible, recruit, engage, and train volunteers in the monitoring of populations, habitats, threats at Eastern Mountain Avens sites Low All Ongoing
36 Develop stewardship initiatives that engage OHV riders and frequent users of the lands adjacent to Eastern Mountain Avens habitat Low OHV use Ongoing

*Unless otherwise noted in the text, the recovery measure applies to all Eastern Mountain Avens sites.

*Unless otherwise noted in the text, the recovery measure applies to all Eastern Mountain Avens sites.

1.3 Critical Habitat

The Species at Risk Act (SARA) requires the identification of the species' critical habitat, to the extent possible, as well as examples of activities that are likely to result in its destruction. Critical habitat was identified for Eastern Mountain Avens in the recovery strategy (Environment Canada 2010); however, conservation and recovery efforts have resulted in significant new information regarding the location of the species and its habitat. As a result, the critical habitat identified in the recovery strategy is no longer in effect and is replaced with the critical habitat identified in this action plan. The 'activities likely to result in destruction of critical habitat' section of the recovery strategy is also being replaced in this action plan. Critical habitat is identified based on the best available information for Eastern Mountain Avens; more precise boundaries may be mapped, and additional critical habitat may be added (or taken away/ removed) in the future if supported by additional data.

This is a full critical habitat identification for Eastern Mountain Avens at all sites in both known Canadian locations: Brier Island and Digby Neck, Nova Scotia. The critical habitat identified in this action plan is considered sufficient to achieve the population and distribution objectives established in the recovery strategy.

1.3.1 Identification of the Species' Critical Habitat

The Eastern Mountain Avens is an arctic-alpine forb that survives in mountain streams at high elevation in New Hampshire, United States, and in wetlands at sea level at Brier Island and on the Digby Peninsula at the mouth of the Bay of Fundy in Nova Scotia, Canada. This Nova Scotia setting provides a boreal climate, with low summer temperatures, and many fogbound days. The majority, more than 95%, of the Eastern Mountain Avens individuals occur at sites on Brier Island but a small nunmber of individuals occur at a site on the mainland end of the Digby Neck peninsula, 15 km east of Brier Island. Most of the Eastern Mountain Avens occur in fens with a minority occurring in anthropogenically disturbed moist to wet old fields on Brier Island. Intensive surveys for Eastern Mountain Avens populations in Nova Scotia have not discovered Eastern Mountain Avens outside of these areas and its occurrence in Nova Scotia is limited to this basaltic peninsula where the vegetation includes various rich fen indicator plants (viz. Shrubby Potentilla (Dasiphora fruticosa), Mountain Fly Honeysuckle (Lonicera villosa), Buckbean (Menyanthes trifoliata), and Livid Sedge (Carex livida)).

As mentioned previously, there are two different habitats within which Eastern Mountain Avens is found. More than 90% of individuals arefound in fen habitat. The remaining 10% of individuals (approximately 600) are in old field habitat. Critical habitat is identified and described below for each of these two habitat types.

Fen habitat

The biophysical attributes of the fen habitat for Eastern Mountain Avens include:

A high water table and low nutrient availability are two of the key attributes of the fen habitat for Eastern Mountain Avens.The vegetation in and surrounding the Eastern Mountain Avens fens is diverse and its low stature is due to waterlogging and low nutrient stresses. If either of these is altered (e.g. a reduction in waterlogging or an increase in nutrient availability), Eastern Mountain Avens habitat is degraded. For example, anthropogenic, historic alterations of drainage at Big Meadow Bog and another bog on Brier Island (Lighthouse Bog), lowered the peat water tables, resulting in loss of Sphagnum and the proliferation of tall shrubs and trees that exclude Eastern Mountain Avens. Also at Big Meadow Bog, gull enrichment has increased nutrient levels and caused a proliferation of fast-growing herbs and tall herbs that outcompete and overtop Eastern Mountain Avens and other native vegetation.

As a result of the importance of hydrology, critical habitat for all fen habitat sites is identified as the fen habitat with the above biophysical attributes in which Eastern Mountain Avens occurs and all of the wetland area that influences the water tables and the hydrological regimes of that fen habitat within the surrounding wetland. This includes all surrounding wetland area above and around each Eastern Mountain Avens fen and the wetland in the outflow zone that influences the hydrological regime of the Eastern Mountain Avens habitat.

Old field habitat

The biophysical attributes of the old field habitat for Eastern Mountain Avens include:

Vegetation change resulting from the cessation of farming will increase rates of evapotranspiration, which should lower the water table in old field areas and reduce the habitat suitability for Eastern Mountain Avens, as the height and proportion of woody plants increase over successional time. The old field Eastern Mountain Avens habitat occurs along the Gull Rock Road, Brier Island over a landscape that was actively farmed until the late 1980s.

Critical habitat for all old field habitat sites is identified as the old field habitat with the above biophysical attributes and includes the swamp where Eastern Mountain Avens occurs, a 25 m upland zone around the swamp edge, as well as the wetland area that influences the water tables and the hydrological regimes of the swamps. A 25 m zone is included because this is the maximum distance between the Eastern Mountain Avens individuals in microtopographic depressions and uplands and the nearest Eastern Mountain Avens wetland, swamp habitat, thus maintaining habitat connectivity between these wetland and non-wetland Eastern Mountain Avens habitats. The long-term persistence of Eastern Mountain Avens in these successional habitats is uncertain; however, it is necessary to include these as critical habitat in support of the population and distribution objectives.

In summary, critical habitat for Eastern Mountain Avens is fully identified in this action plan as all of the fen habitats within which Eastern Mountain Avens occurs, with the biophysical attributes listed above and all of the wetland area that influences the water tables and the hydrological regimes of the Eastern Mountain Avens fen habitats (Appendix A, Figure A-1 and A-2). For old field habitats, critical habitat is the swamp, a 25 m upland zone around the swamp edge, as well as the wetland area that influences the water tables and the hydrological regimes of the swamp and that contain the above biophysical attributes for old field habitat (Figure 3).

In Figures A-1 and A-2 critical habitat occurs within the yellow-shaded polygons (units) shown on the maps, where the criteria described in this section are met. The 1km × 1km UTM grid (red) overlay shown on these figures is a standardized national grid system that highlights the general geographical area containing critical habitat, for land use planning and/or environmental assessment purposes. Anthropogenic structures (e.g., roads, buildings) do not possess the biophysical attributes of the suitable habitat and are not identified as critical habitat.

Overall, four critical habitat units covering approximatively 610.6 ha are identified for Eastern Mountain Avens, including 3 on Brier Island, Nova Scotia (total of 481.1 ha with 36.3 ha in Old Field and 444.8 ha in Fen) and 1 on Digby Neck, Nova Scotia (129.5 ha). The description of these critical habitat units is presented in Appendix A, Table A-1.

1.3.2 Examples of Activities Likely to Result in Destruction of Critical Habitat

Understanding what constitutes destruction of critical habitat is necessary for the protection and management of critical habitat. Destruction is determined on a case by case basis. Destruction would result if part of the critical habitat were degraded, either permanently or temporarily, such that it would not serve its function when needed by the species. Destruction may result from a single or multiple activities at one point in time or from the cumulative effects of one or more activities over time.

Critical habitat for the Eastern Mountain Avens may be destroyed by any alteration to the fen or old field habitat within which Eastern Mountain Avens occurs or to the surrounding wetland habitats that influence the hydrological regime and general suitability of the fens or old field habitats for the survival of Eastern Mountain Avens . Activities described in Table 2 include those likely to cause destruction of critical habitat for the species; destructive activities, however, are not limited to those listed.

Table 2. Examples of activities likely to destroy the critical habitat of Eastern Mountain Avens in Canada.
Description of activity Description of effect (on biophysical attributes or other) in relation to functional loss of critical habitat Eastern Mountain Avens habitat type to which the activity applies Other considerations
Alterations of hydrology (e.g. creation of drainage ditches)

The creation of drainage ditches may alter the hydrology of the habitat, which in turn can alter the vegetation community such that habitat conditions become unsuitable for Eastern Mountain Avens.

A high water table is one of the key attributes of the fen habitat for Eastern Mountain Avens. The vegetation in and surrounding the Eastern Mountain Avens fens is diverse and its low stature is due to waterlogging and low nutrient stresses. If either of these is altered (e.g. a reduction in waterlogging or an increase in nutrient availability), Eastern Mountain Avens habitat is degraded. For example, anthropogenic, historic alterations of drainage at Big Meadow Bog and another bog on Brier Island (Lighthouse Bog), lowered the peat water tables, resulting in loss of Sphagnum and the proliferation of tall shrubs and trees that exclude Eastern Mountain Avens.

  • All fen habitat
  • All old field habitat
  • Wetland areas surrounding Eastern Mountain Avens habitat

The impact associated with this activity includes all surrounding wetland areas above and around each Eastern Mountain Avens habitat and the wetland in the surrounding areas that influences the hydrology of the Eastern Mountain Avens habitat.

Ditching done in the 1950s drastically altered the hydrology at Big Meadow Bog, Brier Island and has resulted in the loss of Eastern Mountain Avens habitat.

Nutrient enrichment (e.g. nutrient runoff from development) Any activity, such as development of residences or roads, that could cause runoff into Eastern Mountain Avens habitat could result in a loss of the low nutrient availability habitat that Eastern Mountain Avens requires.
Low nutrient availability is one of the key attributes of the fen habitat for Eastern Mountain Avens.The vegetation in and surrounding the Eastern Mountain Avens fens is diverse and its low stature is due to waterlogging and low nutrient stresses. If either of these is altered (e.g. a reduction in waterlogging or an increase in nutrient availability), Eastern Mountain Avens habitat is degraded. For example, at Big Meadow Bog, gull enrichment has increased nutrient levels and caused a proliferation of fast-growing herbs and tall herbs that outcompete and overtop Eastern Mountain Avens and other native vegetation.
  • All fen habitat
  • All old field habitat (swamps)
Historically, alteration to the hydrology of an Eastern Mountain Avens fen habitat (Big Meadow Bog) resulted in changes to vegetation such that Herring Gulls were able to nest within the fen habitat, which in turn has resulted in enrichment (increased nutrients), which has led to changes in the vegetation composition and structure.
Habitat disturbance by Off-Highway Vehicles (OHV) OHV use can affect surface water movement and alter the vegetation community such that habitat conditions become unsuitable for Eastern Mountain Avens (as described in the activities above).
  • All fen habitat (excluding surrounding wetland areas)
  • All old field habitat (swamps)
Occasional use in non-wetland sites (within old field habitat) would not typically result in destruction, especially if use occurred in winter or during late summer dry conditions.
Road development or expansion Construction and expansion of roads may cause permanent destruction or degradation of Eastern Mountain Avens habitat by altering the hydrology and causing nutrient runoff.
  • Fen habitat (including surrounding wetland areas)
  • All old field habitat
-
Road maintenance If activities related to the maintenance of existing roads extend beyond the road itself this could result in the degradation of Eastern Mountain Avens habitat by altering the hydrology and causing nutrient runoff.
  • All old field habitat
  • All fen habitat
-
Dam maintenance Maintenance of an existing earthen berm, dam structure, that exists at Digby Neck location could negatively impact the surface and ground water hydrology of the site.
  • Fen habitat at Digby Neck (excluding surrounding wetland areas)

Alterations and maintenance of the dam structure could lead to increased negative impacts to the hydrology of the site.

The earthen dam has already negatively altered the hydrology at the Harris Lake site and has resulted in the loss of Eastern Mountain Avens habitat.

1.4 Proposed Measures to Protect Critical Habitat

With regard to the portions of critical habitat on non-federal lands, Environment and Climate Change Canada will assess the protection currently in place. This involves first working with the Government of Nova Scotia to determine which provincial laws and legal instruments are in place to prevent destruction of critical habitat. If there are gaps in the protection of critical habitat, provisions or measures in place under SARA or other federal legislation will be reviewed to determine whether they prevent destruction of critical habitat. Conservation measures, including stewardship initiatives that contribute to preventing critical habitat destruction will also be considered. The laws, legal agreements, and conservation measures in place that protect critical habitat will be monitored for efficacy at least every five years.

If it is determined that any portions of critical habitat are not protected, and steps are being taken to protect those portions, those steps will be communicated via the Species at Risk Public Registry through the reports referred to in section 63 of SARA.

2. Socio-economic Evaluation

The Species at Risk Act requires that an action plan include an evaluation of the socio-economic costs of the action plan and the benefits to be derived from its implementation (SARA 49(1)(e), 2002). This evaluation addresses only the incremental socio-economic costs of implementing this action plan from a national perspective as well as the social and environmental benefits that would occur if the action plan were implemented in its entirety, recognizing that not all aspects of its implementation are under the jurisdiction of the federal government. It does not address cumulative costs of species recovery in general nor does it attempt a cost-benefit analysis. Its intent is to inform the public and to guide decision making on implementation of the action plan by partners.

The protection and recovery of species at risk can result in both benefits and costs. The Act recognizes that "wildlife, in all its forms, has value in and of itself and is valued by Canadians for aesthetic, cultural, spiritual, recreational, educational, historical, economic, medical, ecological and scientific reasons" (SARA, 2002). Self-sustaining and healthy ecosystems with their various elements in place, including species at risk, contribute positively to the livelihoods and the quality of life of all Canadians. A review of the literature confirms that Canadians value the preservation and conservation of species in and of themselves. Actions taken to preserve a species, such as habitat protection and restoration, are also valued. In addition, the more an action contributes to the recovery of a species, the higher the value the public places on such actions (Loomis and White 1996; DFO 2008). Furthermore, the conservation of species at risk is an important component of the Government of Canada's commitment to conserving biological diversity under the International Convention on Biological Diversity. The Government of Canada has also made a commitment to protect and recover species at risk through the Accord for the Protection of Species at Risk. The specific costs and benefits associated with this action plan are described below.

2.1 Policy Baseline

The province of Nova Scotia has access to many legislative, regulatory, and management tools for the conservation and stewardship of Eastern Mountain Avens (e.g., Nova Scotia Endangered Species Act, Nova Scotia Special Places Protection Act, and Nova Scotia Environment Act). Additionally, many recovery measures can be carried out by federal or provincial species at risk funding programs, in-kind contributions by recovery biologists, or research by universities.

2.2 Profile and Baseline

The areas targeted by this action plan include sites on Brier Island, Nova Scotia and a site on Digby Neck and there are few communities affected by this action plan. This is an area with low human population densities and a low level of economic activity with the primary industries relating to the fishery and ecotourism. Stakeholders are largely private landowners and other stakeholders include the Government of Canada, the Government of Nova Scotia, and Nature Conservancy of Canada. A recovery and conservation parternship has been ongoing in the area for several years in an effort to restore habitat and promote the long term protection and conservation of Eastern Mountain Avens on Brier Island.

2.3 Socio-economic Costs of Implementing this Action Plan

Implementation of the recovery measures identified in Table 1 may generate direct costs as well as social costs. Only the incremental costs are considered and therefore do not include ongoing actions or initiatives discussed in section 2.1 (Policy Baseline).

For Eastern Mountain Avens, both direct and indirect costs as well as social costs are expected to be low (between 0 and 5 million $) over the short-term (2015-2020). Costs at the regional or provincial scale are expected to be minimal. Long-term costs are also expected to be minimal. Direct costs are those that result from the implementation of the measures identified in the implementation schedule of the action plan. These anticipated costs include, salary, travel, materials, equipment and other related costs. Indirect costs are those resulting from the implementing the action plan, which may have an impact on various stakeholders. Impacts to stakeholders include foregoing or modifying current and future activities.

2.4 Benefits of Implementing this Action Plan

It is anticipated that this action plan will contribute to the recovery of Eastern Mountain Avens and lead to the achievement of the population and distribution objective and the conservation and protection of habitat for the species.

Biodiversity is essential for healthy ecosystems, human health, prosperity, security and well being. Canadians derive many benefits from biodiversity including recreational, aesthetic, educational, cultural benefits as well as ecological goods and services essential to human survival. Care for the environment is consistently ranked as one of Canada's top priorities in public opinion polls Footnote3. A recent opinion poll found that three quarters of Canadian respondents feel that preserving natural areas and the variety of native plant and animal life in Canada is important to them Footnote4.

The total value of endangered species consists of non-consumptive use values (such as recreation, spiritual/cultural, research and education), indirect use values (value of the ecological role of a species in an ecosystem) and non-use values (i.e. preserving the benefits of nature for future generations) Footnote5. Achieving the goal of this action plan (i.e. the recovery of the Eastern Mountain Avens) will have a positive impact on society. Brier Island has an existing eco-tourism industry and it is possible that the implementation of recovery measures outlined in Table 1 to restore the Big Meadow Bog could lead to increased eco-tourism on Brier Island. Eco-tourism is the fastest-growing area of the tourism industry (Mastny 2001). In 2004, this market grew three times faster than the industry as a whole and the World Tourism Organization estimates that global spending on eco-tourism is increasing by 20% a year, about six times the industry-wide rate of growth (TEEB 2008).

Eastern Mountain Avens is part of a community of bog vegetation that is unique in Canada, and found only in Nova Scotia. Wetland habitats, where most Eastern Mountain Avens are located, are rich in biodiversity and provide important ecosystem services. By protecting the Eastern Mountain Avens and its critical habitat, benefits extend to other species and the ecosystem. One of the locations for Eastern Mountain Avens is also home to other rare plant species including various orchids, Curly Grass Fern (Schizea pusilla) and Northern Dwarf Birch (Betula michauxii) (Brown 2003). By focusing on increasing protection measures, as well as increasing communication, improved public outreach, education and local stewardship, it is expected that the recovery approaches outlined in the action plan will benefit the larger ecological community as well.

2.5 Distributional Impacts

Although Eastern Mountain Avens occur on private properties, private landowners are not expected to absorb the direct incremental costs for the species' recovery. Any indirect incremental costs resulting from the implementation of recovery measure will be shared. Non-governmental organizations are active where the species occurs and this action plan includes measures aimed at building on current stewardship initiatives.

3. Measuring Progress

The performance indicators presented in the associated recovery strategy provide a way to define and measure progress toward achieving the population and distribution objectives.

Reporting on implementation of the action plan (under s. 55 of SARA) will be done by assessing progress towards implementing the broad strategies.

Reporting on the ecological and socio-economic impacts of the action plan (under s. 55 of SARA) will be done by assessing the results of monitoring the recovery of the species and its long term viability, and by assessing the implementation of the action plan.

4. References

Brown, P. 2003. Big Meadow Bog and Geum peckii : Preliminary Restoration Plan. Nature Conservancy of Canada.

Environment Canada. 2010. Recovery Strategy for the Eastern Mountain Avens (Geum peckii)in Canada. Species at Risk Act Recovery Strategy Series. Environment Canada, Ottawa. 25 pp.

DFO (Fisheries and Oceans Canada). 2008. Estimation of the Economic Benefits of Marine Mammal Recovery in the St. Lawrence Estuary. Policy and Economics Regional Branch, Quebec 2008.

Howie, S. A. and van Meerveld, H. J. 2012. Temporal variation in depth to water table and hydrochemistry in three raised bogs and their laggs in coastal British Columbia, Canada. Hydrol. Earth Syst. Sci. Discuss., 9, 14065–14107.

COSEWIC. 1986. Status report on the Eastern Mountain Avens (Geum peckii). Committee on the Status of Endangered Wildlife in Canada, Canadian Wildlife Service, Ottawa (unpublished report).

Loomis, J.B. & White, D.S (1996). Economic Benefits of Rare and Endangered Species: Summary and Meta-analysis. Ecological Economics, 18: 197-206.

Mastny, L. 2001. Traveling Light: New Paths for International Tourism. The World Watch Institute. PDF

Species at Risk Act (SARA) (S.C. 2002, c. 29) (last update March 2015).

TEEB. 2008. The Economics of Ecosystems and Biodiversity: An Interim Report. Retrieved From: The Economics of Ecosystems and Biodiversity.

Appendix A: Eastern Mountain Avens Critical Habitat in Canada

Figure A-1. Boundaries of the critical habitat units (yellow) for Eastern Mountain Avnes at sites on Brier Island, Nova Scotia. The 1 km × 1 km UTM grid overlay shown on this figure (red) is a standardized national grid system that highlights the general geographical area containing critical habitat. Areas outside the shaded yellow polygons do not contain critical habitat.

Boundaries of the critical habitat unit on Brier Island

Long description for Figure 1-A

Figure A-1 represents a map with standardized 1 × 1 km grid squares that contain critical habitat for the Eastern Mountain Avens in Brier Island, Nova Scotia. 13 grid squares are located from around Hog Yard Cove to around Pero Jack Cove.

Figure A-2. Boundaries of the critical habitat unit (yellow) for Eastern Mountain Avnes at site in Digby Neck, Nova Scotia. The 1 km × 1 km UTM grid overlay shown on this figure (red) is a standardized national grid system that highlights the general geographical area containing critical habitat. Areas outside the shaded yellow polygons do not contain critical habitat.

Boundaries of the critical habitat unit in Digby Neck

Long description for Figure 1-B

Figure A-2 represents a map with standardized 1 × 1 km grid squares that contain critical habitat for the Eastern Mountain Avens in Digby Neck, Nova Scotia.6 grid squares are located from around East Ferry to around north of Dunnings Cove.

Table A–1. 1 km × 1 km standardized UTM Grid Squares containing critical habitat for Eastern Mountain Avens in Canada. Critical habitat occurs where the criteria described in Section 1.3 of the Action Plan are met.
1 × 1 km Standardized grid square ID Table Footnoteb Province/ Territory UTM Grid Square Coordinates Table Footnotec
Easting
UTM Grid Square Coordinates Table Footnotec
Northing
Land tenure Table Footnoted Location
19GK1004 NS 710000 4904000 Non-federal Brier Island
19GK1014 NS 711000 4904000 Non-federal Brier Island
19GK0083 NS 708000 4903000 Non-federal Brier Island
19GK0093 NS 709000 4903000 Non-federal Brier Island
19GK1003 NS 710000 4903000 Non-federal Brier Island
19GK1013 NS 711000 4903000 Non-federal Brier Island
19GK0082 NS 708000 4902000 Non-federal Brier Island
19GK0092 NS 709000 4902000 Non-federal Brier Island
19GK1002 NS 710000 4902000 Non-federal Brier Island
19GK1012 NS 711000 4902000 Non-federal Brier Island
19GK0081 NS 708000 4901000 Non-federal Brier Island
19GK0091 NS 709000 4901000 Non-federal Brier Island
19GK1001 NS 710000 4901000 Non-federal Brier Island
19GK2231 NS 723000 4921000 Non-federal Digby Neck
19GK2241 NS 724000 4921000 Non-federal Digby Neck
19GK2230 NS 723000 4920000 Non-federal Digby Neck
19GK2240 NS 724000 4920000 Non-federal Digby Neck
19GK2139 NS 723000 4919000 Non-federal Digby Neck
19GK2149 NS 724000 4919000 Non-federal Digby Neck

Appendix B: Effects on the Environment and Other Species

A strategic environmental assessment (SEA) is conducted on all SARA recovery planning documents, in accordance with the Cabinet Directive on the Environmental Assessment of Policy, Plan and Program Proposals. The purpose of a SEA is to incorporate environmental considerations into the development of public policies, plans, and program proposals to support environmentally sound decision-making and to evaluate whether the outcomes of a recovery planning document could affect any component of the environment or any of the Federal Sustainable Development Strategy's (FSDS) goals and targets.

Recovery planning is intended to benefit species at risk and biodiversity in general. However, it is recognized that implementation of action plans may inadvertently lead to environmental effects beyond the intended benefits. The planning process based on national guidelines directly incorporates consideration of all environmental effects, with a particular focus on possible impacts upon non-target species or habitats. The results of the SEA are incorporated directly into the action plan itself, but are also summarized below in this statement.

This action plan will clearly benefit the environment by promoting the recovery of the Eastern Mountain Avens. The potential for the plan to inadvertently lead to adverse effects on other species was considered. The SEA concluded that this plan will clearly benefit the environment and will not entail any significant adverse effects. The reader should refer to relevant sections in this document (Measures to be Taken and Implementation Schedule and Socio-economic Evaluation) and in the recovery strategy (Ecological Role; Limiting Factors; Threats; Critical Habitat; Approaches Recommended to Meet Recovery Objectives; and Effects on Other Species).

The effects on other species have been described in the Recovery Strategy for the Eastern Mountain Avens (Geum peckii) in Canada (Environment Canada 2010). Overall, it is anticipated that the recovery actions for the Eastern Mountain Avens will benefit non-target species, ecological processes, and the environment in general. Some threat mitigation actions may impact species, for example, the displacement of gulls, however, it will not be harmful to gull populations overall.

Page details

Date modified: